<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dcterms="http://purl.org/dc/terms/" xmlns:atom="http://www.w3.org/2005/Atom"  xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title><![CDATA[Ara in English - Renfe]]></title>
    <link><![CDATA[https://en.ara.cat/etiquetes/renfe/]]></link>
    <description><![CDATA[Ara in English - Renfe]]></description>
    <language><![CDATA[es]]></language>
    <ttl>10</ttl>
    <atom:link href="http://en.ara.cat:443/rss-internal" rel="self" type="application/rss+xml"/>
    <item>
      <title><![CDATA[By own means]]></title>
      <link><![CDATA[https://en.ara.cat/opinion/by-own-means_129_5811772.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/098b4690-24f3-4cad-9487-12797ac54876_16-9-aspect-ratio_default_0.jpg" /></p><p>Monday 27. Fire in the metro, wagons full of smoke, ambulances, injured. Little surprise and little scandal. My experience, one in millions. Wednesday 15, 11.45 a.m. I get in the car to catch the train in Caldes de Malavella. 12.20 p.m. At the ticket office they tell me I'm lucky: there's a strike but the driver of the next train isn't participating. 1.00 p.m. Halfway there, public address: “<em>Due to a gas leak, this train will stop at Cardedeu. We will open the doors in case anyone wants to continue on their own.</em>” Temperature on the platform, 38º. I hear some drivers talking amongst themselves: a taxi is coming to pick them up and the train will go back, but they won't inform the passengers for now. The tourists stay on the train. 1.20 p.m. The locals queue up <em>on our own</em> at a bus stop. 1.45 p.m. I'm lucky, I get on the bus. 2.10 p.m. In Granollers, I catch a Sagalés to Barcelona. Everyone gets on. The aisle is a tin of sweaty sardines. “I lived in Bolivia, that's the standard there,” says a passenger. The air conditioning can't cope and anxiety spreads. “There's a hammer over there to break the window,” I reassure a lady who is choking. We rush like crazy on the highway. 3.00 p.m. Fabra i Puig. Two metro and FCG transfers. In total, about €20 extra in tickets. I arrive after 4 p.m. to the 3 p.m. meeting, dirty, tired, and starving. More than four hours to travel a hundred kilometers (24 km/h). </p>]]></description>
      <dc:creator><![CDATA[Toni Sala]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/opinion/by-own-means_129_5811772.html]]></guid>
      <pubDate><![CDATA[Wed, 29 Jul 2026 09:57:19 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/098b4690-24f3-4cad-9487-12797ac54876_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Chaos on the commuter rail]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/098b4690-24f3-4cad-9487-12797ac54876_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Renfe dismisses Antonio Carmona, its historic spokesperson in Catalonia]]></title>
      <link><![CDATA[https://en.ara.cat/society/renfe-dismisses-antonio-carmona-its-historic-spokesperson-in-catalonia_1_5810896.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/16ae90c5-8ce5-4d9b-b8aa-5f14cf1c5a53_16-9-aspect-ratio_default_0_x1054y431.jpg" /></p><p>The historic spokesperson for Renfe in Catalonia, Antonio Carmona, has been removed from his position in Rodalies. According to <a href="https://www.lavanguardia.com/local/barcelona/20260728/11602421/renfe-aparta-antonio-carmona-historico-portavoz-rodalies.html" rel="nofollow">has advanced </a><a href="https://www.lavanguardia.com/local/barcelona/20260728/11602421/renfe-aparta-antonio-carmona-historico-portavoz-rodalies.html" rel="nofollow"><em>La Vanguardia</em></a> and the company sources have confirmed to ARA, Carmona was dismissed a few weeks ago as director of institutional relations, from where he acted as an interlocutor with administrations and the media. Since then, according to the same sources, he has been in charge of new "functions in the commercial services" of the railway operator.</p>]]></description>
      <dc:creator><![CDATA[ARA]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/renfe-dismisses-antonio-carmona-its-historic-spokesperson-in-catalonia_1_5810896.html]]></guid>
      <pubDate><![CDATA[Tue, 28 Jul 2026 11:42:51 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/16ae90c5-8ce5-4d9b-b8aa-5f14cf1c5a53_16-9-aspect-ratio_default_0_x1054y431.jpg" type="image/jpeg"/>
      <media:title><![CDATA[The director of Cercanías, Antonio Carmona, in statements to the media.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/16ae90c5-8ce5-4d9b-b8aa-5f14cf1c5a53_16-9-aspect-ratio_default_0_x1054y431.jpg"/>
      <subtitle><![CDATA[A year ago he was already dismissed as director of Rodalies and now he assumes new functions in the commercial services of the company]]></subtitle>
    </item>
    <item>
      <title><![CDATA[A broken-down train causes delays of more than 30 minutes on the commuter and regional lines of the southern corridor]]></title>
      <link><![CDATA[https://en.ara.cat/society/broken-train-causes-delays-of-over-30-minutes-lines-r13-r14-r15-r16-and-r17_1_5810195.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/6eee9bde-12e7-4c94-80f9-99d51cb6f322_16-9-aspect-ratio_default_0.jpg" /></p><p>Lines R13, R14, R15, R16 and R17 of Rodalies are accumulating delays that may exceed 30 minutes since Monday morning due to a technical incident between Sitges and Garraf stations. The disruption originated from a train breakdown, which was stopped until passengers were transferred to another train. Once the transfer was completed, the train was able to resume service. In addition, Rodalies also reported an infrastructure incident on this same stretch. Although the forecast was to gradually recover schedules throughout the morning, the affected lines continue to not return to normal, and at 3 PM in the afternoon, delays of more than half an hour are still maintained.</p>]]></description>
      <dc:creator><![CDATA[ARA]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/broken-train-causes-delays-of-over-30-minutes-lines-r13-r14-r15-r16-and-r17_1_5810195.html]]></guid>
      <pubDate><![CDATA[Mon, 27 Jul 2026 13:03:42 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/6eee9bde-12e7-4c94-80f9-99d51cb6f322_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Rodalies users, waiting for the train at Castelldefels station]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/6eee9bde-12e7-4c94-80f9-99d51cb6f322_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The users of the broken train, between the stations of Sitges and Garraf, have been transferred to another train]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Who watches the builders?]]></title>
      <link><![CDATA[https://en.ara.cat/antoni-bassas-analysis/who-watches-the-builders_1_5807585.html]]></link>
      <description><![CDATA[<p>These you will now see are the images of <a href="https://en.ara.cat/society/collapse-in-the-r2-tunnel-between-barcelona-and-montcada-swallows-large-crane_1_5805908.html" >the crane collapse in Vallbona, Barcelona</a>, in the works to bury the Rodalies line of Montcada i Reixac that Adif is carrying out there. It happened on Wednesday. An enormous crane was swallowed by a sinkhole when the wall of a shaft that was to connect with the railway tunnel being built there gave way. This is the moment when the earth swallows the crane and here you have the image of the landslide it caused. We were lucky, because minutes before, there were workers in this hole, meaning we could now be talking about a tragedy. Consider that the hole that ended up being made was 17 meters deep and 19 meters in diameter. The crane was worth half a million euros. I say it was worth it because we will never see it again. They are injecting concrete into the hole to stabilize the ground with the crane inside, because if they had wanted to remove it, it would have taken them weeks to stabilize the area and be able to continue the works. Adif assures that there have been no movements in the houses, the tracks, or any other point of the works.<a href="https://en.ara.cat/society/movement-of-earth-due-to-the-presence-of-water-possible-origin-of-the-r2-sinkhole_1_5806412.html" >The sinkhole has caused the usual closure of Rodalies</a>, on three lines, at least until next week, the day is unknown. Today we explain that, according to the councilor of the Nou Barris district, Xavier Marcé, the Vallbona collapse could have been caused by the groundwater of the Rec Comtal, which passes through there and which would have contributed to a landslip. In fact, some media outlets explain that the passage of the Rec Comtal was obviously reflected in the project of the work, and that the neighbors also knew about it.And here comes the question: if the geologists knew it, and it must have been in the construction documents, if the neighbors saw it, why didn't the construction companies take it sufficiently into account? The hydrology of the terrain is part of the project for any action.  As if the incident in the Adif works were not bad enough, it turns out that it happened on the same day that a gas leak in Plaça de Sants in Barcelona, where the Generalitat's Department of Territory was carrying out metro works, caused a flare-up that firefighters took hours to extinguish. Here too, they are investigating the origin of the leak and what caused the flare-up. And finally, the Department of Territory is also responsible for the L9 metro works that forced the evacuation of a series of houses in the Putxet neighborhood of Barcelona, about three weeks ago.This morning I asked a public works expert what had happened with this concentration of serious incidents in public works and he told me that he wanted to think it was a trick of Divine Providence, but that the guard on the work done by construction companies could not be lowered. And it is better that they do not lower it, because right now Catalonia has a considerable volume of public works underway and the last thing we need is a state of psychosis.Good morning.</p>]]></description>
      <dc:creator><![CDATA[Antoni Bassas]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/antoni-bassas-analysis/who-watches-the-builders_1_5807585.html]]></guid>
      <pubDate><![CDATA[Fri, 24 Jul 2026 10:10:39 +0000]]></pubDate>
      <subtitle><![CDATA[Right now Catalonia has a considerable volume of public works underway and the last thing we need is a state of psychosis]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The Government wants to request the transfer of Avant trains to create a Catalan high-speed rail network]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-government-wants-to-request-the-transfer-of-avant-trains-to-create-catalan-high-speed-rail-network_1_5801941.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/4defdf6e-df53-4d4b-b236-ded95dea4c88_16-9-aspect-ratio_default_0.jpg" /></p><p>When at the beginning of the year the big Rodalies crisis broke out –after the fatal accident in Gelida and the numerous damages caused by two storms– many users looked for an alternative to avoid the incidents of the conventional service. Those who could, switched to Avant trains: they are more expensive, but also faster, as they run between cities on the high-speed network with regulated fares, and accumulate many fewer delays. For many travelers, arriving on time for work, a medical appointment, or university has already become a priority that weighs more than the cost of the ticket.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-government-wants-to-request-the-transfer-of-avant-trains-to-create-catalan-high-speed-rail-network_1_5801941.html]]></guid>
      <pubDate><![CDATA[Sat, 18 Jul 2026 06:02:34 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/4defdf6e-df53-4d4b-b236-ded95dea4c88_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Passengers on a commuter train in Tarragona]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/4defdf6e-df53-4d4b-b236-ded95dea4c88_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The chaos in Rodalies at the beginning of the year has shot up the demand for these types of trains on a daily basis]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Steering wheel blow to CaixaBank's communication direction]]></title>
      <link><![CDATA[https://en.ara.cat/business/u-turn-at-caixabank-s-communications-department_1_5783203.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/c89352f5-b2cc-4727-b28f-6697c96b303c_16-9-aspect-ratio_default_0_x1898y671.jpg" /></p><p>Changes at CaixaBank. The long-standing Director of Communication and Institutional Relations, Maria Lluïsa Martínez Gistau, is stepping down. She has been at the helm of the entity's communication for 25 years and for the last 10 years has also been a member of the bank's management committee. Her position will be filled by Jordi Soldevila, who until now was in charge of the entity's real estate business. In addition, the Spanish government has rushed to find a name to replace Cani Fernández to chair the National Commission of Markets and Competition (CNMC). The Council of Ministers approved proposing Juan José Ganuza Fernández to assume the position.</p>]]></description>
      <dc:creator><![CDATA[Xavier Grau del Cerro]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/business/u-turn-at-caixabank-s-communications-department_1_5783203.html]]></guid>
      <pubDate><![CDATA[Mon, 29 Jun 2026 05:02:04 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/c89352f5-b2cc-4727-b28f-6697c96b303c_16-9-aspect-ratio_default_0_x1898y671.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Image of CaixaBank's headquarters in Barcelona.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/c89352f5-b2cc-4727-b28f-6697c96b303c_16-9-aspect-ratio_default_0_x1898y671.jpg"/>
      <subtitle><![CDATA[A professor from Pompeu at the head of Competition]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Travelling at high speed now costs half as much as five years ago due to liberalization]]></title>
      <link><![CDATA[https://en.ara.cat/society/travelling-at-high-speed-now-costs-half-as-much-as-five-years-ago-due-to-liberalization_1_5765682.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/5c33de5c-de8f-4368-a3a0-723c10bc543b_16-9-aspect-ratio_default_0.jpg" /></p><p>Traveling from Barcelona to Madrid by high-speed train now costs 44% less than five years ago, when the sector's liberalization began. Although prices have rebounded this year by 9% compared to 2025, the ticket price is now clearly lower than in 2019, according to data from Trainline, the train and bus ticket sales platform. </p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/travelling-at-high-speed-now-costs-half-as-much-as-five-years-ago-due-to-liberalization_1_5765682.html]]></guid>
      <pubDate><![CDATA[Thu, 11 Jun 2026 13:38:54 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/5c33de5c-de8f-4368-a3a0-723c10bc543b_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[An AVE train running through Catalonia in an archive image.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/5c33de5c-de8f-4368-a3a0-723c10bc543b_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The price of the Barcelona-Madrid journey costs 44% less than in 2019, according to the Trainline platform]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The face and the cross of Rodalies: the Garraf tunnels reopen Monday, but the works on the R3 are delayed again]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-face-and-the-cross-of-rodalies-the-garraf-tunnels-reopen-monday-but-the-works-the-r3-are-again-delayed_1_5757381.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/31e3d35d-c3e8-4603-99ba-a1ee8c77faa0_16-9-aspect-ratio_default_0_x1953y890.jpg" /></p><p>One cold and one hot at the works that Adif has underway on the Catalan road network. The work on the Garraf railway tunnels has finished a week earlier than planned and will be able to reopen next Monday the 8th. On the other hand, the infrastructure manager has reported that the R3 works are being extended again: the first phase, which was due to open last May, will not be completed until the end of the year. </p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-face-and-the-cross-of-rodalies-the-garraf-tunnels-reopen-monday-but-the-works-the-r3-are-again-delayed_1_5757381.html]]></guid>
      <pubDate><![CDATA[Wed, 03 Jun 2026 17:59:37 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/31e3d35d-c3e8-4603-99ba-a1ee8c77faa0_16-9-aspect-ratio_default_0_x1953y890.jpg" type="image/jpeg"/>
      <media:title><![CDATA[The Secretary of State and the Minister of Territory, in the center, during the works visit to the Garraf tunnels]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/31e3d35d-c3e8-4603-99ba-a1ee8c77faa0_16-9-aspect-ratio_default_0_x1953y890.jpg"/>
      <subtitle><![CDATA[The works on the R2 Sud have finished one week before the planned and on Monday the test runs will begin]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The orbital line: the solution for commuter rail or a megaproject condemned to eternalize itself?]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-orbital-line-the-solution-for-commuter-rail-or-megaproject-condemned-to-eternalize-itself_1_5747505.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/4fcff5a8-ed05-4e9c-986e-34cebff92c95_16-9-aspect-ratio_default_0.jpg" /></p><p>"Oh, it's difficult to say when the works will begin. It's a complex, very important and strategic line for the country. The urban planning part has been done since 2010 and now we will have to start with studies and projects. It won't be tomorrow; these infrastructures cost". These are statements by the Minister of Economy, Alícia Romero, to Catalunya Ràdio about the macro-project that has been decisive <a href="https://en.ara.cat/politics/the-psc-and-erc-unblock-the-fourth-railway-ring-as-not-to-pass-through-barcelona_1_5733161.html" >to unblock the approval of the budgets</a>: the orbital railway line. ERC wants to reactivate a plan that has been in a drawer for twenty years to give its "yes" to the accounts. In fact, the Republicans present it as a future bet for a network that <a href="https://en.ara.cat/society/lack-of-maintenance-outsourcing-and-climate-change-what-s-behind-the-railway-chaos_130_5628136.html" >this year has experienced an unprecedented crisis</a> and is still trying to recover some semblance of normality.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-orbital-line-the-solution-for-commuter-rail-or-megaproject-condemned-to-eternalize-itself_1_5747505.html]]></guid>
      <pubDate><![CDATA[Mon, 25 May 2026 06:02:27 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/4fcff5a8-ed05-4e9c-986e-34cebff92c95_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Trains stopped at the Renfe workshop in Sant Andreu Comtal, Barcelona]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/4fcff5a8-ed05-4e9c-986e-34cebff92c95_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The €5.200 million project divides the sector on what the priorities of the railway network should be]]></subtitle>
    </item>
    <item>
      <title><![CDATA[After the elections in Andalusia, Catalonia will be able to have budgets]]></title>
      <link><![CDATA[https://en.ara.cat/antoni-bassas-analysis/after-the-elections-in-andalusia-catalonia-will-be-able-to-have-budgets_8_5733455.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/3aeb8813-d748-4370-8497-08adc89c4dfc_16-9-aspect-ratio_default_0.jpg" /></p><p>This morning, sports, Barça, gave us a reason to create a cheerful cover, that of theThe result has been another night of celebration for a fanbase that, unlike what happens in so many other aspects of the country, has high self-esteem. We hope that the adherence to Catalan identity that Barça has provided in a society of immigration continues to function thanks to these successes and the identification with this very young and very normal team. Another good piece of news: the PCR test on the Catalan woman who has been in isolation at the Hospital Clínic since Saturday has come back negative for hantavirus. The woman was admitted for quarantine because she had been in the same plane for a few minutes with the Dutch woman who contracted it on board the cruise ship and who ended up dying.The woman continues to show no symptoms and, in accordance with epidemiological surveillance protocols, will remain confined and under observation at the Clínic for prevention. In seven days, another PCR will be performed to confirm the negative result.And here we return to the harsh reality: from today onwards, the Rodalies service is once again subject to a charge. (It has always been subject to a charge, of course, we all pay for it: we are referring to the user's direct payment). Payment in exchange for what? The trains run when they want, the timetables are an intention, but of course, in many journeys, the train is a bus. The improvement of the service is being slow.  It is clear that due to the harsh reality of education. <a href="https://en.ara.cat/society/cuts-protests-and-actions-in-the-centers-first-day-of-mobilizations-in-public-education_1_5728577.html" >A week of strikes in schools and institutes begins</a>. Relations between the department and the unions are very tense. The only thing missing was for the unions to find out from the radio that the counselor wanted to see them on Thursday. They will meet on Thursday and, on top of that, we have the scandal of the infiltration of two Mossos agents into a teachers' assembly that we already talked about last Friday. Now that more details are known, apart from what it has of authoritarian regime espionage, it is even more humiliating that the police were discovered on such a simple mission.Let's see if it solves things a bit that we have budgets for this 2026. Late, but we will have budgets. So once the Andalusian elections have passed on Sunday, PSC and Esquerra will be able to present their agreement. It is scandalous, but Catalanophobia sets the pace of Spanish politics. Moreno Bonilla is campaigning to preside over Andalusia by constantly talking about Catalonia. After the breakdown weeks ago due to the new financing system for Catalonia, Esquerra set out to find a striking agreement. There is talk of a transfer of powers from the State, but in the meantime, Junqueras has explained that the agreement will include a train, curiously. This: An orbital axis that connects Maresme with Garraf, passing through the two Vallesos, Baix Llobregat and Penedès<a href="https://en.ara.cat/politics/the-psc-and-erc-unblock-the-fourth-railway-ring-as-not-to-pass-through-barcelona_1_5733161.html" >. In black the sections that exist and in yellow those that should be built. We are talking about up to 5,000 million euros of investment, which the State should largely provide. The project is old, but now they have taken it out of the drawer where it was sleeping.</a>Good morning.</p>]]></description>
      <dc:creator><![CDATA[Antoni Bassas]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/antoni-bassas-analysis/after-the-elections-in-andalusia-catalonia-will-be-able-to-have-budgets_8_5733455.html]]></guid>
      <pubDate><![CDATA[Mon, 11 May 2026 09:17:54 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/3aeb8813-d748-4370-8497-08adc89c4dfc_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[After the elections in Andalusia, Catalonia will finally be able to have a budget.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/3aeb8813-d748-4370-8497-08adc89c4dfc_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[Late, but we will have budgets. So Sunday the Andalusian elections have passed, PSC and Esquerra will be able to present their agreement. It is scandalous, but Catalanophobia sets the rhythm of Spanish politics. Moreno Bonilla is campaigning to preside over Andalusia constantly talking about Catalonia. After the break weeks ago due to the new financing system for Catalonia, Esquerra set out to seek a striking agreement.]]></subtitle>
    </item>
    <item>
      <title><![CDATA[To pay or not to pay]]></title>
      <link><![CDATA[https://en.ara.cat/opinion/to-pay-or-not-to-pay_129_5723951.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/bd8530b0-1850-418d-8362-1074e2166965_16-9-aspect-ratio_default_0.jpg" /></p><p>What a joy it is to be loved. We read in ARA that the Minister of Territory, Sílvia Paneque, has informed us that “Rodalies users will pay again to use the train starting next Saturday, May 9. Thus, the last day to use the railway network for free will be Friday, May 8”.</p>]]></description>
      <dc:creator><![CDATA[Empar Moliner]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/opinion/to-pay-or-not-to-pay_129_5723951.html]]></guid>
      <pubDate><![CDATA[Thu, 30 Apr 2026 16:03:55 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/bd8530b0-1850-418d-8362-1074e2166965_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[A Renfe commuter train packed to the rafters]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/bd8530b0-1850-418d-8362-1074e2166965_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Do bad things]]></title>
      <link><![CDATA[https://en.ara.cat/opinion/do-bad-things_129_5713317.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/1ec48565-8b91-4df5-8f8c-6980a43d9042_16-9-aspect-ratio_default_0.jpg" /></p><p>Since I'm in an era of misdeeds, when I feel I have to do everything I haven't done before (skydiving, walking the Camino de Santiago, getting a tattoo), I decide I'll take the infallible railways to go to Terrassa and, from there, take the dangerous Renfe to my Bagenc village. My daughter tells me: "You're not old enough to be doing crazy things as if you were fifteen." She doesn't dare. She'd rather hitchhike and let herself be picked up by one of those criminals who trick young girls than let herself be picked up by Renfe.</p>]]></description>
      <dc:creator><![CDATA[Empar Moliner]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/opinion/do-bad-things_129_5713317.html]]></guid>
      <pubDate><![CDATA[Mon, 20 Apr 2026 17:22:53 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/1ec48565-8b91-4df5-8f8c-6980a43d9042_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[A Renfe convoy]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/1ec48565-8b91-4df5-8f8c-6980a43d9042_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The '30 minuts' immortalizes the drama of Rodalies]]></title>
      <link><![CDATA[https://en.ara.cat/media/the-30-minuts-immortalizes-the-drama-of-rodalies_129_5706431.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/7bc20947-a5ca-4b6b-8a65-01e9fe80660b_16-9-aspect-ratio_default_0_x346y102.jpg" /></p><p>Sunday night, <em>30 minuts</em> condensed the Rodalies drama, both from a historical perspective and from the analysis of the current situation. That the chronology of Renfe's poor service dated back to 1988 was an act of justice to all the users who suffered Renfe's serious deficiencies in silence and with resignation at that time. In fact, the report played with jumps to the past and showed how, since then, everything has gone from bad to worse. The images from 1988 and 2026 by Josep Maria Romeu, the spokesperson for the first Renfe users' platform, demonstrated this. An excellent resource. The archive images from TV3 became a damning proof of the grievances that Catalans have suffered with the precariousness of the service. News of accidents, misfortunes, fires, and breakdowns were accumulating and happening one after another, turning it into a very revealing film of events. In fact, you realized to what extent technological progress available to citizens has been what has allowed the countless deficiencies of Renfe to be denounced. Social networks and mobile phone cameras have allowed users to organize among themselves and publicly denounce the accumulation of blunders they have to endure every day. The testimonies were very well chosen. The exercise of following the journey of a few regular users was also very revealing, because any follow-up trip was a collection of incidents that reflected the chaos. The sequence of the passenger waiting for the alternative bus in Sant Cugat, being scolded by the driver and people recklessly crossing the roundabout, is excellent for confirming the poor organization and how user safety is put at risk.The report <em>Renfe, the endless story</em> reveals that Renfe has had no choice but to accept a forced exercise in transparency. The images from the Renfe control center at Clot station, from where operations are managed, were very revealing. One could call it a <em>center of disarray</em>, with the chaos of stressed workers interfering with each other. That panorama could inspire a <em>sitcom</em>, a <em>workplace comedy</em>. In fact, <em>30 minuts</em> itself distilled an internal thread of a certain sarcasm. A bitter humor like that developed by passengers trapped by the incompetence of Adif and Renfe, this two-headed monster that cannot even agree with itself, as was also clear. The appearance of the singer Gerard Quintana in the middle of it all was the tragicomic echo of how the train ends up determining our lives.More than discovering anything to us, the <em>30 minutes</em> served to immortalize an unforgivable mistreatment of the citizen, as documentary proof for the future. It will be necessary to see if in future generations these images will seem unthinkable to them or if they will only be the next victims of a new chapter in this endless story.</p>]]></description>
      <dc:creator><![CDATA[Mònica Planas Callol]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/media/the-30-minuts-immortalizes-the-drama-of-rodalies_129_5706431.html]]></guid>
      <pubDate><![CDATA[Mon, 13 Apr 2026 16:02:13 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/7bc20947-a5ca-4b6b-8a65-01e9fe80660b_16-9-aspect-ratio_default_0_x346y102.jpg" type="image/jpeg"/>
      <media:title><![CDATA[A moment of 'Renfe, the endless story'.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/7bc20947-a5ca-4b6b-8a65-01e9fe80660b_16-9-aspect-ratio_default_0_x346y102.jpg"/>
      <subtitle><![CDATA[]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Why does Renfe say that the trains were only 2.5 minutes late in the middle of the Rodalies chaos?]]></title>
      <link><![CDATA[https://en.ara.cat/society/why-does-renfe-say-that-the-trains-were-only-2-5-minutes-late-in-the-middle-of-the-rodalies-chaos_1_5705508.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/f4a80001-ce20-4cd0-bb88-004314686af7_16-9-aspect-ratio_default_0.jpg" /></p><p>It was the worst moment of the railway crisis. There were disruptions on practically all lines, multiple daily alerts indicating problems with Rodalies (commuter rail) and more speed restrictions than ever. Users were at their limit and, to top it off, the train drivers went on strike. All this happened last February, when the Rodalies service experienced one of the most complicated moments in its history. Far from what users perceived, however, the statistics compiled by Renfe to analyze delays point in another direction: according to the operator, in February trains had an average delay of only 2 and a half minutes.<a href="https://en.ara.cat/society/one-in-ten-kilometers-of-the-commuter-rail-network-has-speed-limit_1_5633364.html" > speed restrictions</a> than ever. Users were at their limit and, to top it off, <a href="https://en.ara.cat/society/railway-unions-announce-an-agreement-to-call-off-the-train-strike_1_5643195.html" >the train drivers went on strike</a>. All this happened last February, when the Rodalies service experienced one of the most complicated moments in its history. Far from what users perceived, however, the statistics compiled by Renfe to analyze delays point in another direction: according to the operator, in February the trains had an average delay of only 2 and a half minutes.This is reflected in the<em>Monthly Report on Commuter Rail Service Punctuality</em> that Renfe prepares for all autonomous communities each month. It specifies that the delay is 2 and a half minutes if all trains are taken into account (punctual, early, and delayed) and that, if only the trains that are late are taken into account, then the average delay climbs to 26 minutes. But how is it explained that the month when the network worked worst, with a train drivers' strike included, the trains were delayed so little on average? Renfe explains that this statistic only takes into account delays that are "attributable to the operator and over which Renfe can act to improve", and not any other external element, such as all infrastructure incidents, for example. In fact, Renfe's figures indicate that if only problems arising from the operator itself are taken into account, 90% of trains were delayed by less than five minutes. On the other hand, if all circumstances are added up, only 16% of trains arrived on time. "The publication of this data – continue the operator's spokespeople – is a further step in the transparency policy that no other operator is undertaking," they point out.The company's own president, Álvaro Fernández Heredia, explained it this way in a message responding to the spokesperson for the Dignitat a les Vies platform, Anna Gómez, on the social network X.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/why-does-renfe-say-that-the-trains-were-only-2-5-minutes-late-in-the-middle-of-the-rodalies-chaos_1_5705508.html]]></guid>
      <pubDate><![CDATA[Sun, 12 Apr 2026 18:34:14 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/f4a80001-ce20-4cd0-bb88-004314686af7_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Cercanías users in an archive image.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/f4a80001-ce20-4cd0-bb88-004314686af7_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[User platforms reproach the operator that the data is biased]]></subtitle>
    </item>
    <item>
      <title><![CDATA[More than 13,000 trees threatened the Catalan train network lines]]></title>
      <link><![CDATA[https://en.ara.cat/society/more-than-13-000-trees-threatened-the-catalan-train-network-lines_1_5704275.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/c3749acb-ad90-48fe-94ff-84870e95ab0d_16-9-aspect-ratio_default_0_x242y170.jpg" /></p><p>It was one of the reasons that generated the most warnings from train drivers during the peak moments of the railway crisis: the number of trees that fell on or very close to the train tracks has forced Adif to cut down 13,680 trees between January and March. The rain and wind storms Harry and Ingrid exposed the weakness of the Catalan railway network in the face of meteorological inclemencies, and this is reflected in Adif's statistics. Of the total trees felled during this period, the infrastructure manager removed 8,380 as part of its usual vegetation control plan and an additional 5,300 trees as part of the emergency plan for the storms. The most affected area was the Maçanet-Portbou route, in the north of the country.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/more-than-13-000-trees-threatened-the-catalan-train-network-lines_1_5704275.html]]></guid>
      <pubDate><![CDATA[Sat, 11 Apr 2026 04:00:53 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/c3749acb-ad90-48fe-94ff-84870e95ab0d_16-9-aspect-ratio_default_0_x242y170.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Adif workers working on an embankment in an area with fallen trees, next to the tracks]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/c3749acb-ad90-48fe-94ff-84870e95ab0d_16-9-aspect-ratio_default_0_x242y170.jpg"/>
      <subtitle><![CDATA[Adif, Renfe and the Generalitat say that next week will still begin with 179 speed restrictions in force]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Puente and Illa meet for the first time after three months of crisis in Cercanías]]></title>
      <link><![CDATA[https://en.ara.cat/society/meeting-bridge-illa-to-deal-with-the-rodalies-crisis_1_5702032.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/bfaf39cc-c62e-4088-9cf5-05c4c4773928_16-9-aspect-ratio_default_0.jpg" /></p><p>The Minister of Transport, Óscar Puente, met this morning at first light with the President of the Generalitat, Salvador Illa, at Palau, to address the situation in which Renfe's commuter service in Catalonia has been immersed since the crisis opened in January, with the accidents in Adamuz and Gelida. This is the first meeting between the two leaders since the railway crisis broke out, almost three months ago. Puente and Illa arranged this meeting by taking advantage of the fact that the minister has been in Barcelona since yesterday because he attended the first edition of the AENA literary awards last night.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/meeting-bridge-illa-to-deal-with-the-rodalies-crisis_1_5702032.html]]></guid>
      <pubDate><![CDATA[Thu, 09 Apr 2026 06:23:49 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/bfaf39cc-c62e-4088-9cf5-05c4c4773928_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[The Minister of Transport, Óscar Puente, and the President of the Generalitat, Salvador Illa during their meeting at Palau]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/bfaf39cc-c62e-4088-9cf5-05c4c4773928_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The minister plans to visit different points on the Catalan network to see the state of the tracks live]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The drivers defy Renfe: they reject the Garraf schedules and delays in Rodalies worsen]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-drivers-defy-renfe-they-reject-the-garraf-schedules-and-delays-in-rodalies-worsen_1_5695791.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/a3d13b8a-722f-4962-80db-6dc88528947e_16-9-aspect-ratio_default_0.jpg" /></p><p>Problems are piling up on the R2 Sud Rodalies line, in Garraf, since the tunnel maintenance works began <a href="https://en.ara.cat/society/rodalies-first-day-of-work-in-garraf-ve-already-gotten-used-to-the-bus_1_5679737.html" >two weeks ago</a>. The alternative transport plan designed to ensure train circulation while the work continues is not working. The reason? Some of the drivers have refused to work with the new schedules defined by Renfe for this operation, which has rendered the new timetable for the trains useless, as they now run on a single track due to the works. The Spanish drivers' union Semaf alleges that the company did not comply with the established deadlines to give sufficient notice of the changes.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-drivers-defy-renfe-they-reject-the-garraf-schedules-and-delays-in-rodalies-worsen_1_5695791.html]]></guid>
      <pubDate><![CDATA[Wed, 01 Apr 2026 05:04:41 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/a3d13b8a-722f-4962-80db-6dc88528947e_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Rodalies users at Gavà station]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/a3d13b8a-722f-4962-80db-6dc88528947e_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The associations and user platforms criticize the lack of management to resolve this new conflict]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The State refuses to specify what the incidents on the Barcelona-Madrid AVE are]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-state-refuses-to-specify-what-the-incidents-the-barcelona-madrid-ave-are_1_5693368.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/67852776-0a3f-4a56-93cc-ff1c274d3407_16-9-aspect-ratio_default_0_x1681y1105.jpg" /></p><p>The <a href="https://en.ara.cat/society/death-and-destruction-in-adamuz-the-biggest-train-tragedy-of-the-decade-hits-the-small-andalusian-town_1_5622547.html" >tragedies in Adamuz</a> and <a href="https://en.ara.cat/society/train-derails-between-gelida-and-martorell-due-to-the-collapse-of-retaining-wall_1_5623874.html" >Gelida</a> in January, which caused 47 fatalities, cast doubt on the entire Spanish railway system, not only because the accidents called into question the maintenance and safety of the network, but also because since then train travel has not been the same. In Catalonia, Rodalies still suffers from line closures, speed restrictions and service delays, and high-speed journey times have lengthened. Trips from Barcelona to Madrid now take half an hour longer due to the system, and there are unexpected delays and stops on the tracks without anyone providing any explanation to users. The reason is the speed restrictions imposed by the ministry – especially on the Zaragoza-Calatayud stretch – following incidents reported by train drivers. What complaints are we talking about? Were there more incidents than usual after Adamuz? Did the labor dispute between the Semaf union and the ministry, which ended in a strike, have anything to do with it? And more importantly, what actions has Transport taken to resolve the state of the infrastructure? ARA made a transparency request to the Spanish government to clarify these points, but the request has been rejected. In other words, the public administration has refused to release this information, and the Communications Department of the Ministry of Transport refers to the official response given through the transparency process.</p>]]></description>
      <dc:creator><![CDATA[Núria Orriols]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-state-refuses-to-specify-what-the-incidents-the-barcelona-madrid-ave-are_1_5693368.html]]></guid>
      <pubDate><![CDATA[Sun, 29 Mar 2026 12:03:05 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/67852776-0a3f-4a56-93cc-ff1c274d3407_16-9-aspect-ratio_default_0_x1681y1105.jpg" type="image/jpeg"/>
      <media:title><![CDATA[An AVE train at Barcelona's Sants station, in a file image.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/67852776-0a3f-4a56-93cc-ff1c274d3407_16-9-aspect-ratio_default_0_x1681y1105.jpg"/>
      <subtitle><![CDATA[Experts and user platforms assure that this type of information is public in other European countries]]></subtitle>
    </item>
    <item>
      <title><![CDATA[The success of the buses due to the crisis in the commuter rail system is also overflowing onto the Gran Via]]></title>
      <link><![CDATA[https://en.ara.cat/society/the-success-of-the-buses-due-to-the-crisis-in-the-commuter-rail-system-is-also-overflowing-onto-the-gran-via_1_5689067.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/f610e13d-ceca-43ea-84f4-9449138792ec_16-9-aspect-ratio_default_0.jpg" /></p><p>For over a week now, the intercity bus stop on Gran Via, located between Aribau and Muntaner streets, has been teeming with activity. From six in the evening onwards, it becomes an unstoppable hive of activity: buses double-parked, horns blaring, and passengers rushing from work to get home to the various towns in the Garraf region, where these buses serve. Where three buses used to stop, up to six now stop—double the usual number. The reason? Once again, the economic crisis and the commuter rail construction.</p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/the-success-of-the-buses-due-to-the-crisis-in-the-commuter-rail-system-is-also-overflowing-onto-the-gran-via_1_5689067.html]]></guid>
      <pubDate><![CDATA[Wed, 25 Mar 2026 06:00:42 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/f610e13d-ceca-43ea-84f4-9449138792ec_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Accumulation of users on the Gran Via de les Corts Catalanes, between Aribau and Muntaner streets, to catch buses.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/f610e13d-ceca-43ea-84f4-9449138792ec_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[This major Barcelona artery has become a new hotspot for mobility due to the massive transfer of train users.]]></subtitle>
    </item>
    <item>
      <title><![CDATA[Another key project to decongest commuter rail, stalled until beyond 2030]]></title>
      <link><![CDATA[https://en.ara.cat/society/another-key-project-to-decongest-commuter-rail-stalled-until-beyond-2030_1_5684868.html]]></link>
      <description><![CDATA[<p><img src="https://static1.ara.cat/clip/9a2ca2ed-c4a6-48cf-959a-f448f28b8cef_16-9-aspect-ratio_default_0.jpg" /></p><p>The southern commuter rail corridor, one of the most strained sections of the Catalan rail network, continues to face setbacks. This March, it was announced that one of the key projects intended to improve train capacity and flow on this section of the R2 South line—the quadrupling of the tracks between Castelldefels and El Prat—has been stalled once again and is now pushed back to well beyond 2030. The reason? A change of heart by the Ministry of Transport has sent the project back to square one: the initial administrative procedures must begin anew, rendering the original timeline meaningless. Adding these tracks to the R2 line is considered one of the most significant actions in the Commuter Rail Plan in terms of improving capacity in this area. The project is not new; it first appeared in the 2020 Commuter Rail Plan. In mid-2024, with Adif's approval, the construction project was drafted. At that time, the work was considered simply an "expansion" of the existing infrastructure, which technically allowed bureaucratic steps to move forward. </p>]]></description>
      <dc:creator><![CDATA[Natàlia Vila]]></dc:creator>
      <guid isPermaLink="true"><![CDATA[https://en.ara.cat/society/another-key-project-to-decongest-commuter-rail-stalled-until-beyond-2030_1_5684868.html]]></guid>
      <pubDate><![CDATA[Fri, 20 Mar 2026 18:22:18 +0000]]></pubDate>
      <media:content url="https://static1.ara.cat/clip/9a2ca2ed-c4a6-48cf-959a-f448f28b8cef_16-9-aspect-ratio_default_0.jpg" type="image/jpeg"/>
      <media:title><![CDATA[Railway tracks between Castelldefels and El Prat, where the width is reduced from four to two tracks, photographed from the Gavà station and the Cal Alemany footbridge.]]></media:title>
      <media:thumbnail url="https://static1.ara.cat/clip/9a2ca2ed-c4a6-48cf-959a-f448f28b8cef_16-9-aspect-ratio_default_0.jpg"/>
      <subtitle><![CDATA[The quadrupling of the tracks on the R2 South line between Castelldefels and El Prat is delayed due to a bureaucratic procedure at the ministry.]]></subtitle>
    </item>
  </channel>
</rss>
